Laserfiche WebLink
Pre-Job Preparation Safety Access/Location Employee Authorization to STOP Work <br /> 5. Get Permit for Job <br /> 6. Fill out JSA Unloading HDPE Pipe: I have been given authorization,without fear of reprimand or retaliation,to immediately <br /> 7. Review JSA(EVERYONE) STOP any work activity that presents a danger to me,my co-worker or the public;get <br /> 8. Sign JSA(EVERYONE) Wind Direction: involved,question and rectify any situation that is identified as not being in compliance <br /> with our safety and health policies;to report any unsafe conditions or acts to supervision <br /> Evacuation Route: and question any activity that involves violation of established Safety and Health policies. <br /> Assembly Point: <br /> Job Tasks: (What are you doing?) Potential Hazards: Recommended Action or Procedure to <br /> eliminate/miti ate Hazards <br /> Unloading HDPE Pipe Struck B/Against Heavy Equipment • Wear reflective warning vests when exposed to <br /> vehicular traffic <br /> • Isolate equipment swing areas <br /> • Make eye contact with operators before approaching <br /> equipment <br /> • Understand and review hand signals <br /> Unloading HDPE Pipe Handling Heavy Objects • Observe proper lifting techniques <br /> • Obey sensible lifting limits(60 lb.maximum per <br /> person manual lifting) <br /> • Use mechanical lifting equipment(hand carts,trucks) <br /> to move large,awkward loads <br /> Unloading HDPE Pipe Lightning/Severe Weather • Observe proper lifting techniques <br /> • Obey sensible lifting limits(601b.maximum per <br /> person manual lifting) <br /> • Use mechanical lifting equipment(hand carts,trucks) <br /> to move large,awkward loads <br /> Unloading HDPE Pipe Slips,Trips, Falls • Clear walkways,work areas of equipment,vegetation, <br /> excavated material,tools,and debris <br /> • Mark,identify,or barricade excavations <br /> • Evaluate fall hazards above 4 ft.;use fall protection <br /> equipment(harness/lanyard),standard guardrails or <br /> other fall protection systems when working on elevated <br /> platforms above 6 ft. <br />