My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2016_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2016_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:36:38 PM
Creation date
7/3/2020 10:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2016_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2016_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-Job Preparation Safety Access/Location Employee Authorization to STOP Work <br /> 5. Get Permit for Job <br /> 6. Fill out JSA Unloading HDPE Pipe: I have been given authorization,without fear of reprimand or retaliation,to immediately <br /> 7. Review JSA(EVERYONE) STOP any work activity that presents a danger to me,my co-worker or the public;get <br /> 8. Sign JSA(EVERYONE) Wind Direction: involved,question and rectify any situation that is identified as not being in compliance <br /> with our safety and health policies;to report any unsafe conditions or acts to supervision <br /> Evacuation Route: and question any activity that involves violation of established Safety and Health policies. <br /> Assembly Point: <br /> Job Tasks: (What are you doing?) Potential Hazards: Recommended Action or Procedure to <br /> eliminate/miti ate Hazards <br /> Unloading HDPE Pipe Struck B/Against Heavy Equipment • Wear reflective warning vests when exposed to <br /> vehicular traffic <br /> • Isolate equipment swing areas <br /> • Make eye contact with operators before approaching <br /> equipment <br /> • Understand and review hand signals <br /> Unloading HDPE Pipe Handling Heavy Objects • Observe proper lifting techniques <br /> • Obey sensible lifting limits(60 lb.maximum per <br /> person manual lifting) <br /> • Use mechanical lifting equipment(hand carts,trucks) <br /> to move large,awkward loads <br /> Unloading HDPE Pipe Lightning/Severe Weather • Observe proper lifting techniques <br /> • Obey sensible lifting limits(601b.maximum per <br /> person manual lifting) <br /> • Use mechanical lifting equipment(hand carts,trucks) <br /> to move large,awkward loads <br /> Unloading HDPE Pipe Slips,Trips, Falls • Clear walkways,work areas of equipment,vegetation, <br /> excavated material,tools,and debris <br /> • Mark,identify,or barricade excavations <br /> • Evaluate fall hazards above 4 ft.;use fall protection <br /> equipment(harness/lanyard),standard guardrails or <br /> other fall protection systems when working on elevated <br /> platforms above 6 ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.