Laserfiche WebLink
0 0 0 <br />GeoSyntec Consultants <br />Table 2-1 (Continued) <br />Summary of Waste Management Units <br />Forward Landfill <br />Waste Area <br />Area <br />Classification or Area <br />Method of <br />Designation <br />(acres) <br />Description <br />Operation <br />Description of Wastes Disposed" <br />Status <br />Notes <br />D-99 <br />3° <br />Class II Landfill <br />Area fill <br />Nonhazardous solid wastes, inert wastes, <br />Construction <br />Constructed to meet Class II landfill <br />asbestos, sewage and wastewater treatment <br />completed in Summer <br />standards: 2 -foot compacted clay liner on <br />sludges, automotive shredder wastes and <br />of 1999, anticipated to <br />base, GCL on side slopes, flexible <br />designated wastes. <br />begin accepting waste <br />membrane liner, and blanket leachate <br />in Fall 1999 <br />collection and removal system <br />Future D <br />22.2 <br />Class II Landfill <br />Area fill <br />Nonhazardous solid wastes, inert wastes, <br />Permitted, not yet <br />Designed to meet Class II landfill <br />(portions of Future D include a <br />asbestos, sewage and wastewater treatment <br />constructed <br />standards: proposed 2 -foot compacted clay <br />vertical expansion above other <br />sludges, automotive shredder wastes and <br />liner on base, flexible membrane liner, and <br />existing WMUs) <br />designated wastes. <br />blanket leachate collection and removal <br />system. <br />E (Eastern Ash <br />Disposal Pit) <br />4.9" <br />Class II Landfill <br />Area fall <br />Flyash and coal, wood, charcoal, and fire <br />Closed <br />Constructed to meet Class II landfill <br />demolition ash <br />standards: 2 -foot compacted clay liner and <br />blanket leachate collection and removal <br />system. <br />Interim F <br />IS <br />Class II Interim Surface <br />Evaporation <br />Landfill leachate. <br />To be closed in Fall <br />Compacted clay liner. <br />Impoundment <br />1999 <br />F -North <br />5.6" <br />Storm water retention basin and <br />Evaporation <br />Landfill leachate and liquid wastes <br />Operating <br />Constructed to meet Class 11 standards. <br />Class II Surface Impoundment <br />compatible with the liner <br />F -South <br />2.6° <br />Storm water retention basin and <br />Evaporation <br />Landfill leachate and liquid wastes <br />Permitted, not yet <br />Designed to meet Class II standards. <br />Class II Surface Impoundment <br />compatible with the liner. <br />constructed <br />G -North <br />--- i <br />Class II Treatment Area <br />Land treatment <br />Soils contaminated with petroleum <br />Operating <br />No liner or leachate collection and removal <br />(overlaps portions of Future D) <br />hydrocarbons or other approved compounds. <br />system <br />G -South <br />27.5" <br />Class II Treatment Area <br />Land treatment <br />Soils contaminated with petroleum <br />Operating <br />No liner or leachate collection and removal <br />(overlaps WMU H) <br />hydrocarbons or other approved compounds. <br />system <br />H <br />24.9° <br />Class lI Landfill <br />Area fill <br />Nonhazardous solid wastes, inert wastes, <br />Permitted, not yet <br />Designed to meet Class II landfill <br />asbestos, sewage and wastewater treatment <br />constructed <br />standards: proposed 2 -foot compacted clay <br />sludges, automotive shredder wastes and <br />liner, flexible membrane liner, blanket <br />designated wastes. <br />leachate collection and removal system. <br />The RRF is currently located within <br />WMU H. <br />J:\ALLIED\FORWARD\CL.OSUREPLAN\FTS\TABLE 2-1 3 of 4 99.11.30 <br />