My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />GeoSyntec Consultants <br />Table 2-2 <br />Environmental Monitoring Plan <br />Forward Landfill <br />Environmental Issue <br />Environmental Measures and Monitoring Programs <br />Schedule of Implementation <br />Soils <br />1. Follow grading plan for construction of sidesiopes and top slope. <br />Ongoing. <br />2. Vegetate the final cover. <br />As scheduled. <br />Surface Water <br />1. Implement surface -water control plan with ditches, swales, and <br />Ongoing. <br />retention basins. <br />2. Install liner and leachate collection and removal system (LCRS) <br />Ongoing. <br />consisting of drainage layer, piping, and sumps. <br />3. Construct Class II surface impoundment for containment of leachate. <br />North impoundment completed, <br />south impoundment as scheduled. <br />4. Monitor LCRS. <br />Daily. <br />5. Test LCRS. <br />Annually. <br />6. Conduct sampling program for leachate. <br />Upon detection, monthly to <br />7. Prohibit the discharge of contact surface water to creek. <br />semiannually. <br />Ongoing. <br />8. Prohibit the discharge of contact surface water offsite. <br />Ongoing. <br />9. Annual winterization. <br />Fall. <br />10. Storm Water Pollution Prevention Plan <br />Ongoing. <br />Groundwater <br />1. Monitor groundwater. <br />Quarterly or semiannually. <br />2. Compacted clay liners, geomembranes, geosynthetic clay liners. <br />Ongoing. <br />3. Monitor moisture beneath leachate collection sumps with lysimeters. <br />Quarterly. <br />4. Implement surface -water control plan with ditches, swales, and <br />Ongoing. <br />retention basins. <br />5. Install LCRS consisting of liner, drainage layer, piping, and sumps. <br />Ongoing. <br />6. Construct Class II surface impoundment for containment of leachate. <br />North impoundment completed, <br />7. Monitor LCRS. <br />south impoundment as scheduled. <br />8. Test LCRS. <br />9. Conduct sampling program for leachate. <br />Daily. <br />Annually. <br />Upon detection, monthly to <br />semiannually. <br />Air Quality <br />1. Implement dust control measures. <br />Ongoing. <br />2. Implement asbestos monitoring program. <br />Semiannually. <br />3. Conduct personnel air monitoring. <br />Semiannually. <br />4. Conduct protective equipment program for employees. <br />Ongoing. <br />5. Implement control measures for contaminated soils. <br />Ongoing. <br />6. Cover wastes and prevent ponding of water. <br />Daily. <br />7. Landfill gas monitoring in perimeter probes and buildings <br />Quarterly <br />Public Health and Safety <br />1. Conduct litter collection program. <br />Daily. <br />2. Compact refuse and apply soil cover. <br />Daily. <br />3. Inspect landfill for rodent activity. <br />Daily. <br />4. Maintain equipment and vehicles to prevent fires. <br />Ongoing. <br />5. Train personnel in fire suppression activities. <br />Ongoing. <br />6. Maintain water supplies and facilities. <br />Ongoing. <br />7. Monitor groundwater. <br />Quarterly or semiannually. <br />8. Install site fences. <br />Ongoing. <br />9. Retain surface water. <br />Ongoing. <br />10. Provide bottled water for drinking. <br />Ongoing. <br />11. Train employees. <br />Weekly. <br />12. Place warning signs. <br />Ongoing. <br />13. Site not open to public. <br />Ongoing. <br />14. Use safety equipment. <br />Ongoing. <br />15. Active bird control. <br />Daily, as needed. <br />J:WLLIED\FORWARD\CLOSUREPLAN\FTS\TABLE 2-2 1 of 2 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.