Laserfiche WebLink
WMU B Closure Schedule (see Section 3.5) <br />Figure 2-1 Site Location Map <br />Figure 2-2 Existing/Proposed Conditions <br />Figure 2-3 Monitoring and Control Systems <br />Figure 3-1 Grading and Drainage Plan <br />Figure 3-2 Details <br />J:\ALLIED\FORWARD\CLOSUREPLAN\REPORT iii 99.11.30 <br />GeoSyntec Consultants <br />5. PARTIAL FINAL CLOSURE AND POST -CLOSURE MAINTENANCE <br />COSTESTIMATE ...................................................................................................5-1 <br />6. REFERENCES.........................................................................................................6-1 <br />7. LIMITATIONS.........................................................................................................7-1 <br />LIST OF TABLES <br />Table 1-1 <br />RWQCB Closure Plan Requirements per Title 27, CCR, §21769 ......... 1-4 <br />Table2-1 <br />Summary of WMUs...............................................................................2-5 <br />Table 2-2 <br />Environmental Monitoring Plan ............................................................. 2-9 <br />Table 2-3 <br />Current GroundwaterNadose Zone Monitoring..................................2-11 <br />Table 2-4 <br />Groundwater Monitoring Well Construction Details ........................... <br />2-12 <br />Table 2-5 <br />Summary of Laboratory Analyses for Groundwater Monitoring ......... <br />2-13 <br />Table 2-6 <br />Liner and LCRS Descriptions.............................................................. <br />2-14 <br />Table 2-7 <br />Leachate Monitoring Summary ............................................................2 <br />-15 <br />Table 2-8 <br />Summary of Leachate Volumes for 1998 .............................................2-16 <br />Table 2-9 <br />Summary of Leachate Volumes for 1999 .............................................2-16 <br />Table 2-10 <br />Table 3-1 <br />Landfill Gas Monitoring <br />Final Cover Materials............................................................................. <br />2-17 <br />3-7 <br />Table 3-2 <br />Assumed Material Properties, Final Cover Slope Stability Analysis... <br />3-11 <br />Table 3-3 <br />Final Cover Slope Stability Results ...................................................... <br />3-12 <br />Table 5-1 <br />Partial Final Closure and Post -Closure Maintenance Plan Cost <br />Estimates................................................................................................. 5-2 <br />LIST OF SCHEDULES <br />WMU B Closure Schedule (see Section 3.5) <br />Figure 2-1 Site Location Map <br />Figure 2-2 Existing/Proposed Conditions <br />Figure 2-3 Monitoring and Control Systems <br />Figure 3-1 Grading and Drainage Plan <br />Figure 3-2 Details <br />J:\ALLIED\FORWARD\CLOSUREPLAN\REPORT iii 99.11.30 <br />