WMU D-99 Construction September 1999 <br /> Forward Landfill Job No.986011.02 <br /> requirements of 90 percent of the laboratory maximum dry density. Results of the <br /> moisture-density testing and modified Proctor tests are presented in Appendix E. After <br /> the excavation/fill and subgrade foundation preparation was completed, a survey of the <br /> subgrade was performed to verify proper line and grade. Additionally, Vector's CQA <br /> Monitor verified the thickness of the fill by potholing in six locations. Thickness checks <br /> of the fill material are included in Appendix E. <br /> Prior to GCL installation on the slopes and geomembrane on the floor, Vector <br /> and the liner installer(GSE)walked the area and an Acceptance of Surface Condition <br /> form was signed by GSE and Vector. Signed Acceptance of Surface Condition forms are <br /> presented in Appendix F. <br /> 4.3 Clay Liner <br /> 4.3.1 Processing of Clay Liner Materials <br /> Vector's CQA monitor observed the processing of the clay liner material for <br /> the base liner of WMU D-99. The clay liner consisted of the select on-site material <br /> and imported Narco clay. The select material was placed on the mixing pad in a <br /> 0.75-foot lift. After the select material was graded to the desired thickness, the <br /> Narco clay was placed upon the select material to a thickness of 0.25 feet. A <br /> survey laser and a receiver on a road grader were utilized to control the thickness. <br /> The select material and Narco clay were processed to a depth of 12 inches <br /> utilizing a WR2500 and RS-650 mixer. Moisture was added concurrently during <br /> the mixing process to achieve the correct moisture condition. Vector's CQA <br /> Monitor performed moisture checks to ensure that the moisture content was 2 to 5 <br /> percent above optimum. During the processing activities, Vector's CQA Monitor <br /> observed and documented all aspects of the procedure. <br /> The select material, Narco clay, and the final admix clay liner soils were <br /> tested in Vector's on-site laboratory to verify the suitability of the material as a low <br /> permeable layer. Moisture-density relationship (ASTM D1557), Atterberg limits <br /> (ASTM D-4318) and grain size distribution (ASTM D-422)tests were performed on <br /> the clay liner material (including both select on-site material and Narco clay). Test <br /> results indicated that the clay liner material met the project specifications. Results <br /> Vector Engineering, Inc. - 12438 Loma Rica Dr.,#C - Grass Valley, CA - (530)272-2448 <br /> -7- <br />