Laserfiche WebLink
6. Problems which impede the construction schedule and corrective measures: <br /> A. Butch will check to see how long it will take to get approval to abandon the <br /> monitoring well following the July 6"' public hearing. <br /> 7. Review submittal schedules: <br /> A. Guinn checked the submittal register and they are all caught up on their <br /> submittals. <br /> B. Guinn provided the weekly safety meeting minutes to Butch. <br /> 8. Review of off-site manufacturing and delivery schedules: <br /> A. The LCRS pipe and drainage pipe have been delivered. <br /> B. Delivery of geosynthetics is on-going. <br /> C. GSE is utilizing the forklift provided by Forward to unload the geosynthetics. <br /> D. GCL certifications were delivered to Arizona. Bill will contact Dale to find out <br /> where the certifications were sent and will get Vector a copy. <br /> 9. Access issues: <br /> A. Guinn will backfill the anchor trench along the east slope to facilitate access <br /> to the bench. <br /> B. GSE ill leave an unlined area along the south slope of - 9 so that the GCL <br /> can be brought down from the ash pit. <br /> 10. Health and safety issues: <br /> No issues. <br /> 11. Other items: <br /> No issues. <br /> n:/986011.01/Weekly Progress Meetings/06-29-99 Meeting 4.doc Page 3 <br />