Laserfiche WebLink
D <br /> 1I20f99 Synthetic Industries Page 1 ? <br /> ru <br /> individual(toll Data � <br /> Bill of Lading 626275 <br /> U <br /> Roll# Style Batch Weight Thick Tensile Elongation T.Tear Burst Punct <br /> Osy mils Lbs lbs % % lbs Lbs psi bs <br /> D5261 D5199 D4632 D4632 D4632 D4632 D4533 D4533 D3786 D4833 <br /> 5153916A 651 50928 6.5 90 192 240 64 73 91 114 443 122 <br /> M <br /> 5153929A 651 50928 6.8 94 199 246 67 74 99 121 396 123 Z <br /> 6058150A 651 64283 6.8 94 213 237 63 68 109 132 394 140 n <br /> 6058154A 651 60283 6.5 92 204 243 65 66 9B 128 397 112 D <br /> m <br /> 6056176A 651 60283 6.3 8B 192 234 63 70 99 122 361 119 <br /> 60MI90A 651 60263 7 96 228 261 67 68 96 144 403 127 <br /> 6058264A 651 64 6.8 97 229 251 71 74 106 121 360 t2B Z <br /> 026 <br /> 0 <br /> m <br /> m <br /> k <br /> 0 <br /> U <br /> r <br /> W <br /> m <br /> srthefic Industries'cement standard manufacturing quality control(MMC)wSting frequency for GEOTEX nonwoven geolextiles is one(1)test per 90,000 sf(8,360 sm) for index propertiesCD <br /> (mass per unit area.thickness.grab tensile and elongation.trapezoidal lean.rnu8en burst and ncture resistance)for styles heavier Man 601 and one(1)test per16ZOO sf{15.01X}so} <br /> for index properties for srple 601 and lighter. Although Yx strive to test our nonwovenfor apparent opening sae(AOS)and Perrru'L Ayfpe rflow rate <br /> approxilmnely 0) <br /> schedules.R dy.customer requiremeents, <br /> once every 540.000 st(50.160 sm),the actual frequency of testi V for performance r�vary de panding upon ptodtrdlorb ro <br /> job specifications or other agreements arranged with S Retic krdustries Prior to the of pure• if ad��W test is^eaded to meet higher frequencies required by the project -.I <br /> specifications,a is the purchasers responsibility to rmtiry SyrrMetic tr�rrstries circ assistance in calarfatin9 the r for the additional tests. <br /> Once roes of nonwoven$eotextaes are produced.inspected and the test n�uks the frequermy slated above indicates that materials produced during the production run meats air <br /> published minimum average roll values,approved rolls are sh for storage until an oder requires the materia(14 lobe Since rods are boded at the warehouse isdependerri ofp <br /> production sequence lest results listed above may include date from rolls which not shipped.However,the date ed is from the same production run as Me roIts actually stripped on D <br /> this bill of lading. <br /> m <br /> m <br /> <n <br /> Cn <br /> mm <br />