Laserfiche WebLink
09/02/98 11:04 Page t <br /> syuthatio Industrial <br /> Individual Roll Data <br /> Bill of Ladingi624930 <br /> Roil style Maaa/ Lab °ransile Elongation Trap Tear Mullan Punct <br /> Number Unit Thick (MD) (xmD) (MD) (XMD) (MD) W40) Buret Restat <br /> oay Milo lba lba 6 t The lba psi lbs <br /> D5291 n5199 D4612 04632 D4632 D4632 D4S33 D4533 153786 154813 <br /> 9056318A • --_-6-6-•,'89 218 <br /> __- -_--- <br /> 651 60 95 396 126 <br /> 6056324A 651 6.9 224 64 <br /> 4096328A 651 6.9 91 210 238 62 69 106 126 376 126 <br /> 6OS6337A $51 6.7 86 216 221 65 71 103 135 377 135 <br /> 6056548A 651 6.7 96 213 236 66 74 112 124 396 129 <br /> 60S6552A 651 6.7 95 226 223 6S 69 101 121 374 127 <br /> 6056564A 6S1 7.0 96 210 240 67 74 106 120 368 127 <br /> Synthetic Industries'current standard manufacturing quality control(MQQ testing frequency for GEOTEX nonwoven geotextiles <br /> is one(1)test per 40,000 sf(8,360 am)for index properties(mass per unit area,thickness,grab tensile and elongation.trapezoidal <br /> tear,mulles burst and puncture resistance)for styles heavier than 601 and one(1)test per 162,000 sf(I 5,000 sm)for index properties <br /> for style 601 and lighter. Although we strive to test our nonwoven geotextiles for apparent opening size(AOS)And <br /> Permittivity/permeability/water flow rate approximately once every 540,000 sf(50,160 am).the actual tYequency of testing for <br /> performance properties will vary depending upon production schedules.product availability,customer requirements,job <br /> specifications or other agreements arranged with Synthetic Industries prior to the time of purchase. If additional testing is needed to <br /> meet higher frequencies required by the project specifications,it is the purchasers responsibility to notify Synthetic Industries <br /> and ask for assistance in calculating the costs for the additional tests. <br /> Once rolls of nonwoven geotextiles arc produced.Inspected and the test results from the frequency stated above indicates that <br /> materiels produced during the production run meets our published minimum average roll values,approved rolls are shipped for <br /> storage until an order requires the material to be shipped. Since rolls are loaded at the warehouse independent of production sequence <br /> test results listed above may include data from rolls which were not shipped. However,the data provided is from the same <br /> production run as the rolls actually shipped on this bill of lading, <br />