Laserfiche WebLink
5/17/99 Synthetijwustries Pa <br /> 9 <br /> Individual Roll Data <br /> Bill of Lading 627188 <br /> Roll # Style Batch Weight Thick Tensile Elongation T.Tear Burst Punct <br /> MD XMD MD XMD MD XMD <br /> Osy mils lbs lbs % % lbs lbs psi lbs <br /> D5261 D5199 D4632 D4632 D4632 D4632 D4533 D4533 D3786 D4833 <br /> B822081A 650 80157 56 145 51 99 130 114 26 26 199 50 <br /> B822084A 650 80157 6.9 157 65 105 126 128 37 45 224 71 <br /> K901952A 650 90030 6 7 136 86 130 112 132 45 39 226 64 <br /> K901955A 650 90030 7 136 83 152 110 129 49 45 243 62 <br /> K901958A 650 90030 7 146 86 146 107 134 48 47 241 69 <br /> C � <br /> Synthetic Industries'current standard manufacturing quality control(MOC)testing frequency for GEOTEX nonwoven geotextiles is one(1)test per 90,000 sf(8,360 sm) for index properties <br /> (mass per unit area,thickness,grab tensile and elongation,trapezoidal tear,mullen burst and puncture resistance)for styles heavier than 601 and one(1)test per 162,000 sf(15,000 sm) <br /> for index properties for style 601 and lighter. Although we strive to test our nonwoven geotextiles for apparent opening size(AOS)and Permittivity/permeability/water flow rate approximately <br /> once every 540,000 sf(50,160 sm),the actual frequency of testing for performance properties will vary depending upon production schedules,product availability,customer requirements, <br /> job specifications or other agreements arranged with Synthetic Industries prior to the time of purchase. If additional testing is needed to meet higher frequencies required by the project <br /> specifications,it is the purchaser's responsibility to notify Synthetic Industries and ask for assistance in calculating the costs for the additional tests. <br /> Once rolls of nonwoven geotextiles are produced,inspected and the test results from the frequency stated above indicates that materials produced during the production run meets our <br /> published minimum average roll values,approved rolls are shipped for storage until an order requires the material to be shipped. Since rolls are loaded at the warehouse independent of <br /> production sequence test results listed above may include date from rolls which were not shipped. However,the date provided is from the same production run as the rolls actually shipped on <br /> this bill of lading. <br /> MM <br />