07/02/99 Constructi®n Field Report Job No. 986011.0: <br /> DFR No. 39 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 39 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day nW Week: <br /> Manteca,CA Butch Ste*iiJr. 7-02-99 Frida <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction I GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Techniciannechnician: <br /> Clear Warm FRANK DELL-ERA <br /> ANTONIO HENRIQUEZ <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator, 966D Cat loader,Water <br /> Truck, CS 563C Cat Smooth Drum Roller. Allied:Forklift. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 4 total Tim Guinn GSE Crew: 22 total <br /> Guinn has 3 laborers and foreman placing and welding 50' sections together of HDPE pipe on the cell floor <br /> in the East West LCRS channel. Guinn welded 9 sections of pipe together. Guinn utilized the water truck to <br /> maintain moisture in the exposed clay material. <br /> GSE had 10 more crew arrive on site. GSE deployed geomembrane on the cell floor, sump area and the <br /> eastern slope from the 2nd bench down to the I'bench. GSE completed placement on the cell floor except <br /> for the southern tie in to the ashpit. GSE completed placement of the GCL and liner in the sump area. GSE <br /> squared up GCL and liner and made the tie in from the 2nd bench above the cell on the eastern slope o to <br /> e 1"bench. A total of 20 panels were placed with approximately 00000ft2 of geomembrane being <br /> deployed. All panels were seamed and airtested. GSE performed repairs on all of the geomembrane material <br /> placed. <br /> Vector Engineering,Inc. Logged panel deployment of geomembrane and GCL,overlap, start-ups, seaming <br /> airtesting. CQA pulled 7 destructs with destruct#12 failing the required specification's. GSE pulled samples <br /> in 10' intervals off of each end of the failing destruct and tested them prior to removing destruct samples for <br /> testing by CQA. Destruct 12A was pulled 20 feet to the west of#12 and 12B was pulled 10' East of destruct <br /> 12and both passed the required specifications <br /> No material arrived on site today. <br /> Material Delivered Total fO Delivered Total if Delivered to Date <br /> HDT 60 mil 105,300 <br /> HME 60 mil 169,200 <br /> HST 60 mil 378,000 <br /> Geonet 71,400 <br /> Geotextile 81,000 <br /> Geocom osite Single sided 210,000 <br /> Geocom osite Double sided 119,000 <br /> GCL 317,100 <br /> [File Name:Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />