Laserfiche WebLink
the final stage closure will be integrated with the interim features utilized during active <br /> operations. <br /> Post-Closure Cost Estimate <br /> The 2002 post-closure cost estimate was updated to reflect 2008 costs and includes <br /> the newly required additional back-up cost information under 27 CCR reviewed fe-r <br /> eensisteney with e uvreri+ (2004) . It was determined that no changes to the post- <br /> closure cost estimate are necessary to implement the staged closure of the FL. The <br /> 20022008 post-closure cost estimate is included herein as Table 4. Once a given <br /> stage is completed and the area is certified as closed:then post-closure maintenance <br /> activities consistent with the 2002 PCPCMP and Amendments Pro'i.', Rary Pest <br /> will commence. Post-closure activities will be conducted for <br /> a minimum of 30 years or until the operator can demonstrate that the site no longer <br /> poses a threat to the public and the environment. <br /> 13 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\FinalCPRRevl.doc; <br /> Amendment No.3:7 2 ) <br />