My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:48:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the creek are well down now and the incident was caused by a <br /> combined high rainfall event and increased releases from the upstream <br /> reservoir. <br /> ■ Upstream flood control dams released flows several times in anticipation <br /> of storm cells moving through Central California. These storm <br /> precipitations and upstream flows affected the Forward Landfill. <br /> On March 2, 2005, the RWQCB issued a NOV to the Forward Landfill Inc. <br /> This NOV requires Forward Landfill Inc. to do the following: <br /> ■ Forward Landfill Inc. should immediately submit a plan, no later than <br /> March 10, 2005 and undertake actions to collect and control the current <br /> release. Work to comply with this request was completed. <br /> ■ Forward Landfill Inc. should submit a plan to prevent infiltration and <br /> protect the foot of the landfill from overflow at Little Johns Creek by May <br /> 15, 2005. <br /> In response to the NOV letter, Forward Landfill Inc. engineering staff met with <br /> the RWQCB on April 22, 2005, to review the conditions noted in the NOV and <br /> discuss the activities already completed as well as partial closure activities. <br /> The RWQCB generally agreed that the proposed activities would meet the <br /> requirements of the NOV. <br /> In order to mitigate the seep area only a portion of the Stage I area requires <br /> closure at this time. Therefore Stage I has been divided into two areas Stage <br /> IA and Stage IB (see Figure 1). In response to the NOV, Stage IA will be <br /> closed as presented in this PFCPCMP. Stage IB will be closed as originally <br /> planned in the 2003 Plan in 2006. <br /> In addition, Forward Landfill Inc. has also proposed utilization of an <br /> alternative final cover design using an evapotranspiration type cap consisting <br /> of selected on-site materials. In concept, the RWQCB agreed to consider <br /> this type of alternative final cover design. Forward Landfill Inc. and their <br /> consultant made a presentation to the RWQCB on May 20, 2005 to provide <br /> information on the proposed alternative final cover. Also in response to the <br /> Forward Landfill PFCPCMP 1-2 <br /> Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sect.doc: <br />
The URL can be used to link to this page
Your browser does not support the video tag.