My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:48:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landfill Gas Control System Protection/Reinstallation 9 weeks <br /> Erosion Control Installation 2 weeks <br /> ® Demobilization 1 week <br /> As shown on Table 5 closure construction will occur over a 12-week period <br /> assuming there are no delays due to weather and/or equipment/personnel <br /> downtime. <br /> 3.13.3 CONSTRUCTION MANAGEMENT <br /> A construction management team will be on-site during the entire period of <br /> construction. The team will be under the direction of a construction manager, <br /> who will be responsible for supervision of construction of the various features <br /> included in the closure plan. The construction manager will coordinate the <br /> activities of the on-site contractor(s) and will provide liaison among the design <br /> engineers and the contractors. Other key staff may include a site engineer <br /> and construction inspector(s). A survey crew and a geotechnical CQA crew <br /> will be present, as required. <br /> Survey Control <br /> The survey control crew, under the direction of the contractor will be <br /> responsible for surveyed location of the closure plan improvements and for <br /> record drawing information. They will be responsible for establishing survey <br /> control to verify that the various components of the cover conform to grade <br /> and/or thickness requirements of the construction drawings and <br /> specifications. <br /> CQA For Final Cover Placement <br /> The construction specifications will include the CQA Plan for final cover <br /> placement. A geotechnical CQA crew, under the direction of a Geotechnical <br /> Engineer, will be on-site full-time during the placement of the final cover to <br /> monitor compliance with cover design and installation methods included in <br /> the CQA Plan. The CQA personnel will have day-to-day responsibility to <br /> oversee cover placement and to evaluate whether the cover is constructed <br /> according to specifications. <br /> Forward Landfill PFCPCMP 3-18 <br /> Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec3.doc:6/16/2008 <br />