Laserfiche WebLink
FORWARD LANDFILL <br /> PRELIMINARY CLOSURE/POST-CLOSURE MAINTENANCE PLAN <br /> SVISIONAMENDMENT <br /> TABLE OF CONTENTS <br /> 3.0 PROFESSIONAL CERTIFICATION OF ACCURACY 14 <br /> FIGURES <br /> Figure 1 Closure Stage I <br /> Figure 2 Closure Stage II <br /> Figure 3 Closure Stage III <br /> Figure 4 Closure Stage IV <br /> Figure 5 Closure Stage V <br /> Figure 6 Closure Stage VI <br /> Figure 7 Closure Stage VII <br /> Figure 8 Closure Stage VIII <br /> Figure 9 Final Cover Transition Between Lined Area Stages Typical Bench Detail <br /> TABLES <br /> Table 1 Staged Closure Matrix <br /> Table 2 Closure Implementation Schedule - 187.6-Acre Closure Area <br /> Table 3 Closure Cost Estimate Summary - 187.6-Acre Closure Area <br /> Table 4 Annual Post-Closure Maintenance and Monitoring Cost Estimate Summary <br /> ATTACHMENT <br /> Attachment 1: Stage I Closure Area Site Life Calculations <br /> Attachment 2: Stage IA Partial Final Closure/Post-Closure Maintenance Plan <br /> (dated June 2005) - Text/Tables/Figures only <br /> -ii- <br /> Forward Landfill-PCPCMP Amendment No.3R <br /> (Z:\PROJECTS\Al lied Waste\1N81013 5 yr Review Plan\PCPCMP Amend 3 July 08\TOC.DOC;Revision 1:7/3/2008) <br />