6.0 CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATE <br /> 6.1 INTRODUCTION <br /> In order to establish the basis for the proper level of funding to close and <br /> provide post-closure maintenance for Stage IA of the Forward Landfill in an <br /> environmentally sound manner, a cost estimate has been prepared reflecting <br /> the proposed closure design and post-closure maintenance procedures <br /> presented in Sections 3 and 4 of this FPCPCMP. The estimate for closure <br /> improvements was combined with an estimate for construction <br /> management/quality assurance services to determine the total closure cost. <br /> 6.2 CLOSURE COST ESTIMATE <br /> The Plan features are grouped into categories for convenience in presenting <br /> the cost estimate. A brief description of the components included in each <br /> category is given below. The total closure cost estimate is shown on Table 6. <br /> 6.2.1 FINAL COVER <br /> Based on the Stage IA final grading plan, the approximate area which will <br /> require placement of final cover is 30 acres. The proposed final cover for <br /> Stage IA of the Forward Landfill will consist of a minimum one-foot thick <br /> foundation layer of select soil, which has been placed as interim cover in the <br /> Stage IA partial closure area, and a three-foot thick layer of select soil that <br /> will comprise the upper monolithic cover layer. This category also includes <br /> costs for clearing and grubbing and settlement/survey monument installation. <br /> 6.2.1.1 FINAL COVER CONSTRUCTION QUALITY ASSURANCE MONITORING <br /> AND TESTING <br /> Costs for construction quality assurance include the final cover placement <br /> tests, inspections and reporting. <br /> Forward Landfill PFCPCMP 6-1 <br /> Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 6.doc:6/16/2008 <br />