Laserfiche WebLink
6.2.9 STRUCTURE REMOVAL/DECOMMISSIONING OF ENVIRONMENTAL <br /> CONTROLSYSTEMS <br /> No costs are associated with this category since no structure removal or <br /> decommissioning of environmental systems is required for closure of Stage <br /> IA. <br /> 6.2.10 ENGINEERING DESIGN <br /> This category includes costs for the preparation of construction level <br /> engineering design plans and specifications for bid purposes. This cost is <br /> assumed to be two percent of the construction cost. <br /> 6.2.11 CONSTRUCTION MANAGEMENT <br /> The construction management cost for the Stage IA closure is based on the <br /> closure construction period. This cost is assumed to be 4 percent of the <br /> construction cost. <br /> 6.2.12 CONTINGENCY <br /> A 20 percent contingency factor has been added to the construction cost <br /> estimate. <br /> 6.3 DISBURSEMENT OF FUNDS <br /> In accordance with 27 CCR, Section 21800, the operator is required to <br /> provide a detailed schedule for disbursement of funds for closure for advance <br /> payment of closure construction activities to be performed in accordance with <br /> the Plan or reimbursement of costs to be performed in accordance with the <br /> Plan. Table 7 shows the anticipated disbursement of funds necessary to <br /> complete construction for Stage IA partial closure area of the Forward <br /> Landfill. Forward Landfill Inc. will request a release of funds from the CIWMB <br /> Financial Assurance Branch prior to the start of closure construction <br /> activities. <br /> Forward Landfill PFCPCMP 6-3 <br /> ZAPROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 6.doc:6/16/2008 <br />