Laserfiche WebLink
7.0 PROFESSIONAL CERTIFICATION OF ACCURACY <br /> Current regulations require that a registered civil engineer or a certified engineering <br /> geologist prepare and certify the accuracy of closure plans for all Class II landfills. The <br /> Forward Landfill Stage IA Partial Final Closure/Post-Closure Maintenance Plan has been <br /> prepared in accordance with 27 CCR, Chapters 3 and 4, and 40 CFR, Part 258, as <br /> certified by Mr. Bryan Stirrat, a California Registered Civil Engineer, Registration Number <br /> C 22631. <br /> Respectfully Submitted: <br /> Bryan A. Stirrat, P.E. <br /> R.C.E. No. C 22631 <br /> Forward Landfill PFCPCMP 7-1 <br /> Z:\PROJECTS\Allied waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 7.doc:6/16/2008 <br />