Laserfiche WebLink
TABLE 6 <br /> FORWARD LANDFILL <br /> CLOSURE COST ESTIMATE SUMMARY <br /> STAGE IA PARTIAL CLOSURE AREA <br /> ESTIMATED <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE COST <br /> 1 ($) <br /> 11 ENGINEERING DESIGN(4) <br /> 1 Is $85,000 $85,000 <br /> Subtotal $85,000 <br /> 12 CONSTRUCTION MANAGEMENT(5) <br /> 4%of construction cost 1 Is JZ3.692 <br /> Subtotal $73,692 <br /> Total Construction Cost $2,107,483 <br /> Contingency 20% $421,497 <br /> Total Closure Cost Estimate $2,528,980 <br /> Notes: <br /> (1) Costs for preparation and compaction of the existing one foot of foundation is included in this item. <br /> (2) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one <br /> foot of soil would already be in place. <br /> (3) No cost is included in this category because the system is currently in-place and/or no modification is required <br /> as part of the Stage IA partial closure. <br /> (4) Cost is for engineering design and preparation of construction documentation(plans and specifications)for <br /> bid purposes. <br /> (5) Cost is for monitoring contractors work,coordinating CQA activities, meetings, liaison between design <br /> engineers and contractors,etc. <br /> Forward Landfill PCPCMPR <br /> Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\Tables\ClosCst;Revision 1:6/16/2008 Page 2 of 2 <br />