My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:39:42 AM
Creation date
7/3/2020 10:49:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
remaining refuse capacity at the site as of January 2000 is estimated to be <br /> approximately 48,064,900 cy (based on a refuse to soil volume ratio of 6:1 and a <br /> refuse density of 1,740 pounds per cy). The site capacity calculations reflecting <br /> this information are included in Appendix C. <br /> 4.6 SITE LIFE PROJECTION <br /> 4.6.1 SITE LIFE CALCULATIONS <br /> In order to calculate the site°fife for the Forward Landfill; the following criteria <br /> was utilized. <br /> • Remaining Site Capacity (with liner, daily, <br /> intermediate and final cover) 51 mcy <br /> • '_Refase.to"Cover Ratio '6:1 <br /> • In-Place Density 1,740 lbs/cy <br /> Based.on the-ab«ve• teriwand°utilizing a-starting4nffc rate-of 4,400 tpd with a <br /> 1.5 % annual growth rate and a maximum daily permitted refuse inflow rate of <br /> 7,880 ted, the Forward Landfill will have a projected site life of 19 years. Based <br /> on these calculations (see Table 8) operations at the Forward Landfill could <br /> extend to June 2020 <br /> 4.6.2 FACTORS AFFECTING SITE CAPACITY <br /> Many factors can affect the ultimate site capacity of a4 given landfill including <br /> variations in waste type, compaction rates, the use of alternative daily covers and <br /> the annual tonnage delivered_to the landfill. The actual.daily tonnage at the <br /> Forward Landfill depends greatly on the economy. Since a good maJority of the <br /> waste accepted at the ForwardLandfill will be construction/demolition type <br /> wastes, the inflow will be dependent on how much of that type of work is <br /> occurring in the area. The tonnage will also vary as the contracts with clients <br /> fluctuate and specialty markets change. Therefore, there may be times when the <br /> Forward Landfill will be accepting the maximum permitted tonnage of 7,880 tpd <br /> a. <br /> and others where it will fall way below. Table 8 is presented to provide a rough <br /> estimation of the inflow to the Forward Landfill for permitting purposes. <br /> Forward Landfill JTD 4-10 <br /> L:\Allied\2000.193\R eports\fi na Ijtd:S ec-4.0.doc:08/20/01 <br /> BQYAN A.STIRFiAT S ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.