Laserfiche WebLink
mmmm = = = = mmm mim <br /> TABLE 2 <br /> FORWARD LANDFILL <br /> CLOSURE IMPLEMENTATION SCHEDULE <br /> 217.8 ACRE CLOSURE AREA <br /> TASKS MONTHS <br /> 2 3 4 5 0 it 12 <br /> Equipment Mobilization <br /> Site Exploration and Survey <br /> Foundation Layer Preliminary Grading <br /> —--------- <br /> Placement of the Foundation Layer <br /> Placement of Barrier Layer <br /> Placement of Vegetative Layer <br /> Drainage Control System Construction(over refuse) <br /> -—-------- <br /> Gas Extraction System <br /> D, ourom <br /> De.mobilization <br /> L:\Allied\2003.003 Western Region\FORWARD\Table 24mplementationI01003.XLS <br />