Laserfiche WebLink
LANDFILL CAPACITY <br /> CALCULATION WORKSHEET <br /> DATE 12/18/03 Forward Landfill <br /> CALC BY CM Phase I Life <br /> CRITERIA <br /> REFUSE ACCEPTED <br /> VOLUME(TONS/DAY) 5,105.0 <br /> DAYS/WEEK: 6 <br /> LIFE OF SITE(YEARS) <br /> AIRSPACE CAPACITY(CUBIC YARDS) 7,660,000 <br /> REFUSE DENSITY(LBS/CY): 1,740 <br /> REFUSE TO COVER RATIO(X:1),X= 6 <br /> CALCULATIONS BASED ON TOPO DATE OF: <br /> DATE THAT FILL IS INITIALIZED: 15 Jun 02 <br /> TOTAL REFUSE CAPACITY <br /> TOTAL ANNUAL <br /> VOLUME(CUBIC YARDS) 6,565,714 1,830,759 <br /> TONNAGE 5,712,171 1,592,760 <br /> COVER MATERIAL REQUIRED <br /> TOTAL ANNUAL <br /> VOLUME(CUBIC YARDS) 1,094,286 305,126 <br /> AMOUNT OF AIRSPACE AVAILABLE <br /> TOTAL ANNUAL <br /> VOLUME(CUBIC YARDS) 7,660,000 2,135,885 <br /> FILL TIME <br /> LIFE(YRS) 3.59 <br /> DATE THAT FILL CAPACITY IS REACHED: 14 January 06 <br /> BRYAN A.STIRRAT&ASSOCIATES <br />