My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:13:36 AM
Creation date
7/3/2020 10:49:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_4.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />0 <br />fl <br />0 <br />11 <br />I I <br />G' <br />l� <br />Vector Engineering <br />Daily Field Report <br />Job Number: 021605.02 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number: <br />Forward ART -03 <br />Lochlin Caffey <br />01 <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton <br />Forward Inc. (Allied Waste <br />3/26/03 <br />Wed <br />Com an <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Guinn <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Jay Weller <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Equipment on site: I <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Arrived on site 8 am. <br />Discussed with Jay the project schedule: subgrade preparation will be completed early next week, HDPE placement <br />around the berm will start Monday, March 31, 2003. Currently contractor does not need anything from Vector to proceed. <br />Call Lochlin, up date him about the work progress. Verify with him that CQA doesn't have to do anything regarding the <br />HDPE. Inform him that we will be back on site early next week. <br />Prepared By: Vince Suryasasmita, P.E. Reviewed By: <br />1 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.