My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:13:36 AM
Creation date
7/3/2020 10:49:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_4.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r] <br />u <br />n <br />WMLI ART -03 May 2003 <br />Forward Landfill Project No. 021605.02 <br />FORWARD LANDFILL, INC. <br />Vector Engineering, Inc, provided periodic site visits for construction quality assurance <br />services during the installation of Waste Management Unit ART -03 at the Forward <br />Landfill, which began March 26, 2003 and finished April 24, 2003. As described in the <br />Contract Documents for the project, the following final construction certification report <br />was prepared by Vector and is hereby submitted to the Regional Water Quality Control <br />Board (RWQCB) as required. <br />This report was prepared in accordance with generally accepted geotechnical and <br />geosynthetic engineering practices applicable at the time the report was prepared. <br />Vector makes no other warranties, either expressed or implied, as to the professional <br />advice provided under the terms of this agreement, and as described in this report. Our <br />report consists of professional opinions and conclusions based on our testing and <br />inspection program performed during construction. <br />The purpose of this report is to inform the RWQCB that, in our professional opinion, the <br />composite liner system has been constructed and completed in general accordance <br />with the plans and specifications, the Solid Waste Facility Permit (SWFP), California <br />regulations, and 40 CFR 258, Subtitle D. During the construction, Vector conducted the <br />necessary observations and testing to verify that the installation was conducted <br />properly. The conclusions of our observations and testing together with a written <br />narrative describing the personnel, scope, methods, procedures and results of our CQA <br />services, have been included in this certification report. <br />•nv —WI <br />AQ G►,, <br />No. 0055568 <br />1F <br />Bryan Fritzle , RCE No. C55568 <br />CQA Engineer of Record <br />Vector Engineering, Inc. a 143E Spring Hill Drive a Grass Valley, CA a (530) 272-2448 <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.