Laserfiche WebLink
7. The estimate of leachate production will be conservative until full liner <br /> development for the Austin Road portion of the site occurs. Peak leachate <br /> generation values are similarly conservative as the peak occurred two years <br /> out of the 12-year total (16.67 percent of the time). It is likely that one of <br /> these peaks will occur during partial liner conditions (i.e., all the liner at <br /> Austin Road site will not be in use, therefore, peak production will not be <br /> realized). <br /> 8. Actual precipitation, leachate generation, evaporation, and impoundment <br /> storage conditions will vary. <br /> 9. Leachate remaining in the WMU F-North and WMU F-West basins late each <br /> summer should be pumped prior to the next rainy season to reduce the <br /> potential that the impoundment capacity will be exceeded during periods <br /> when storage needs are most critical. <br /> 10. The agreement with the City of Stockton Waste Water Treatment Plant to <br /> accept excess leachate as needed will be maintained. <br /> 2 BRYAN A.STIRRAT AND ASSOCIATES <br /> L:\Allied\Forward Landfill\FU-03 Basin\Design Rpt-LE\LEACHATE VOLUME 081603.Doc <br />