My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Work of This Contract <br /> 1. Except as otherwise specifically stated in applicable parts of these Contract <br /> Documents, the CONTRACTOR shall provide and pay for labor, materials, <br /> equipment, tools, construction equipment, facilities, and services necessary <br /> for proper execution, testing, and completion of the Work. <br /> 2. The completed Work will provide OWNER with a landfill liner, leachate <br /> collection and removal system, and protective operations layer which was <br /> constructed in accordance with the requirements of California Code of <br /> Regulations Title 27 and site specific permits. <br /> D. Major Work Elements Include: <br /> 1. Excavation <br /> 2. General Earthfill <br /> 3. Grading and Subgrade Preparation <br /> 4. Clay Liner <br /> 5. GCL <br /> 6. HDPE Geomembrane <br /> 7. Cushion Geotextile <br /> 8. Granular Drainage Material <br /> 9. Geocomposite Drainage Net <br /> 10. Filter Geotextile <br /> 11. Protective Operations Layer <br /> 12. Coarse Gravel <br /> 13. Leachate Collection Pipes and Riser <br /> 1.4 OWNER FURNISHED PRODUCTS <br /> A. The OWNER shall retain and pay for the services of a surveyor for pre- <br /> construction and as-built surveys. <br /> B. The OWNER shall retain and pay for the services of the QA/QC CONSULTANT. <br /> C. The OWNER shall furnish the onsite soils for clay liner, general earthfill, and <br /> protective operations layer. <br /> 1.5 MEETINGS AND COORDINATION <br /> A. Preconstruction meetings will be conducted between the OWNER, DESIGN <br /> ENGINEER and/or QA/QC CONSULTANT, EARTHWORK CONTRACTOR, <br /> and GEOSYNTHETICS CONTRACTOR. Specification requirements for that <br /> particular sequence of construction will be reviewed and discussed. The <br /> EARTHWORK and GEOSYNTHETICS CONTRACTOR shall present a <br /> construction plan for each construction sequence, as applicable, outlining the <br /> equipment, personnel, schedule and materials required. <br /> B. The EARTHWORK and GEOSYNTHETICS CONTRACTOR (when onsite) will <br /> be required to attend and participate in weekly construction meetings to review <br /> the schedule, specification requirements, quality control requirements, and other <br /> concerns involved. <br /> FORWARD LANDFILL 01 100 <br /> 2 SUMMARY <br />
The URL can be used to link to this page
Your browser does not support the video tag.