Laserfiche WebLink
review survey results and may independently verify survey results. The time taken <br /> by the OWNER to perform the survey (2 working days) and provide survey results <br /> to the QA/QC CONSULTANT (2 working days) and by the QA/QC <br /> CONSULTANT in checking and verifying the survey results (2 working days) will <br /> be considered included in the total calendar days allotted the EARTHWORK <br /> CONTRACTOR before liquidated damages are assessed. <br /> C. The OWNER will perform up to two as-built surveys of each layer. If more that two <br /> surveys are required for any layer due to the EARTHWORK CONTRACTOR's <br /> deficiencies in providing required thickness or grade, the costs for these additional <br /> surveys will be at the EARTHWORK CONTRACTOR's sole expense. <br /> 1.7 SURVEYS FOR MEASUREMENT AND PAYMENT <br /> A. The aerial topographic survey depicted on the Construction Drawings and the <br /> preconstruction survey will be used as the base topography for measurement <br /> calculations. The DESIGN ENGINEER shall provide the EARTHWORK <br /> CONTRACTOR with an electronic file of the aerial and preconstruction <br /> topographic survey. <br /> B. When the Specifications or the OWNER require Bid Schedule items of Work to <br /> be measured by surveying methods, the EARTHWORK CONTRACTOR shall <br /> perform the surveys. The EARTHWORK CONTRACTOR will reduce the field <br /> notes and calculate final quantities for payment purposes. The calculations will be <br /> given to the OWNER and QA/QC CONSULTANT for review. <br /> 1.8 SURVEYING ACCURACY AND TOLERANCES <br /> A. Control traverse field surveys and computations shall be performed to an accuracy <br /> of at least 1:25000. <br /> B. The tolerances generally applicable in setting survey stakes shall be as set forth <br /> below. Such tolerances shall not supersede stricter tolerances required by the <br /> Construction Drawings or Specifications. <br /> Type of Line or Mark Horizontal Position Elevation <br /> Permanent reference points 1 in 10,000 ±0.01 ft. <br /> General Excavation <br /> and Earthwork 1 in 2,000 ±0.10 ft. <br /> C. Tolerances for minimum thicknesses shown on Construction Drawings shall be <br /> +0.2 foot. <br /> D. Tolerances for slope grades flatter than 4:1 (horizontal;vertical) shall be +0.2 <br /> percent measured within 75-foot grid points. <br /> FORWARD LANDFILL 01410 <br /> 3 SURVEYS <br />