My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
review survey results and may independently verify survey results. The time taken <br /> by the OWNER to perform the survey (2 working days) and provide survey results <br /> to the QA/QC CONSULTANT (2 working days) and by the QA/QC <br /> CONSULTANT in checking and verifying the survey results (2 working days) will <br /> be considered included in the total calendar days allotted the EARTHWORK <br /> CONTRACTOR before liquidated damages are assessed. <br /> C. The OWNER will perform up to two as-built surveys of each layer. If more that two <br /> surveys are required for any layer due to the EARTHWORK CONTRACTOR's <br /> deficiencies in providing required thickness or grade, the costs for these additional <br /> surveys will be at the EARTHWORK CONTRACTOR's sole expense. <br /> 1.7 SURVEYS FOR MEASUREMENT AND PAYMENT <br /> A. The aerial topographic survey depicted on the Construction Drawings and the <br /> preconstruction survey will be used as the base topography for measurement <br /> calculations. The DESIGN ENGINEER shall provide the EARTHWORK <br /> CONTRACTOR with an electronic file of the aerial and preconstruction <br /> topographic survey. <br /> B. When the Specifications or the OWNER require Bid Schedule items of Work to <br /> be measured by surveying methods, the EARTHWORK CONTRACTOR shall <br /> perform the surveys. The EARTHWORK CONTRACTOR will reduce the field <br /> notes and calculate final quantities for payment purposes. The calculations will be <br /> given to the OWNER and QA/QC CONSULTANT for review. <br /> 1.8 SURVEYING ACCURACY AND TOLERANCES <br /> A. Control traverse field surveys and computations shall be performed to an accuracy <br /> of at least 1:25000. <br /> B. The tolerances generally applicable in setting survey stakes shall be as set forth <br /> below. Such tolerances shall not supersede stricter tolerances required by the <br /> Construction Drawings or Specifications. <br /> Type of Line or Mark Horizontal Position Elevation <br /> Permanent reference points 1 in 10,000 ±0.01 ft. <br /> General Excavation <br /> and Earthwork 1 in 2,000 ±0.10 ft. <br /> C. Tolerances for minimum thicknesses shown on Construction Drawings shall be <br /> +0.2 foot. <br /> D. Tolerances for slope grades flatter than 4:1 (horizontal;vertical) shall be +0.2 <br /> percent measured within 75-foot grid points. <br /> FORWARD LANDFILL 01410 <br /> 3 SURVEYS <br />
The URL can be used to link to this page
Your browser does not support the video tag.