Laserfiche WebLink
5. If acceptance testing by the QA/QC CONSULTANT indicates that the Clay <br /> Liner Material does not meet specified requirements for particle size, <br /> classifications, plasticity, or hydraulic conductivity, then the Clay Liner <br /> Material which failed will be retested. If the second test results indicate <br /> failure to meet the specified requirements, the QA/QC CONSULTANT may <br /> order a design modification or the removal, disposal, and replacement of the <br /> unsuitable Clay Liner Material. <br /> 6. Clay Liner Acceptance: Final acceptance of the clay liner will be based on <br /> acceptance and control tests made on completed Work, on material samples <br /> taken from the completed layer, and the thickness as calculated from the top <br /> of subgrade and top of clay liner surveys. Acceptance testing for final <br /> acceptance shall be performed by the soil testing laboratory in accordance <br /> with these Specifications and the CQA Manual. <br /> G. Protection: <br /> 1. Do not route or allow construction traffic, except as necessary, on top of <br /> clay liner once material has been placed and compacted. <br /> 2. Constructed clay liner shall be maintained to meet the requirements of this <br /> Specification until final completion and acceptance of the Work. This shall <br /> include all measures to prevent erosion. During seasonal or other extended <br /> shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1, <br /> PROTECTION OF EXPOSED SURFACES, of this Section. In addition, <br /> Amhk the clay liner shall be protected from any contamination which increases the <br /> hydraulic conductivity. Any contaminated material shall be removed and <br /> replaced at no cost to the OWNER. <br /> 3.10 COARSE GRAVEL MATERIAL <br /> A. General Requirements: Coarse Gravel shall be placed around leachate collection <br /> pipe and in sump area as shown on the Construction Drawings and should be fully <br /> encapsulated by geotextile. <br /> B. Coarse Gravel Placement: <br /> 1. The HDPE geomembrane lining underlying the Coarse Gravel shall be <br /> inspected and approved prior to placement of the Coarse Gravel. <br /> 2. Equipment used to place and compact the coarse gravel shall not travel <br /> directly on the underlying geomembrane and without a minimum 12-inch <br /> thickness of GDM in place. <br /> 3. Method of dumping and spreading materials shall be approved by the <br /> QA/QC CONSULTANT and shall ensure uniform distribution of the <br /> material and prevent damage to the underlying geotextile and geomembrane <br /> lining. Approval does not absolve the EARTHWORK CONTRACTOR of <br /> responsibility for damage to underlying components. <br /> 4. Compaction of Coarse Gravel shall be accomplished by shovel-slicing <br /> during dumping. <br /> FORWARD LANDFILL 02300 <br /> 17 EARTHWORK <br />