My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. If acceptance testing by the QA/QC CONSULTANT indicates that the Clay <br /> Liner Material does not meet specified requirements for particle size, <br /> classifications, plasticity, or hydraulic conductivity, then the Clay Liner <br /> Material which failed will be retested. If the second test results indicate <br /> failure to meet the specified requirements, the QA/QC CONSULTANT may <br /> order a design modification or the removal, disposal, and replacement of the <br /> unsuitable Clay Liner Material. <br /> 6. Clay Liner Acceptance: Final acceptance of the clay liner will be based on <br /> acceptance and control tests made on completed Work, on material samples <br /> taken from the completed layer, and the thickness as calculated from the top <br /> of subgrade and top of clay liner surveys. Acceptance testing for final <br /> acceptance shall be performed by the soil testing laboratory in accordance <br /> with these Specifications and the CQA Manual. <br /> G. Protection: <br /> 1. Do not route or allow construction traffic, except as necessary, on top of <br /> clay liner once material has been placed and compacted. <br /> 2. Constructed clay liner shall be maintained to meet the requirements of this <br /> Specification until final completion and acceptance of the Work. This shall <br /> include all measures to prevent erosion. During seasonal or other extended <br /> shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1, <br /> PROTECTION OF EXPOSED SURFACES, of this Section. In addition, <br /> Amhk the clay liner shall be protected from any contamination which increases the <br /> hydraulic conductivity. Any contaminated material shall be removed and <br /> replaced at no cost to the OWNER. <br /> 3.10 COARSE GRAVEL MATERIAL <br /> A. General Requirements: Coarse Gravel shall be placed around leachate collection <br /> pipe and in sump area as shown on the Construction Drawings and should be fully <br /> encapsulated by geotextile. <br /> B. Coarse Gravel Placement: <br /> 1. The HDPE geomembrane lining underlying the Coarse Gravel shall be <br /> inspected and approved prior to placement of the Coarse Gravel. <br /> 2. Equipment used to place and compact the coarse gravel shall not travel <br /> directly on the underlying geomembrane and without a minimum 12-inch <br /> thickness of GDM in place. <br /> 3. Method of dumping and spreading materials shall be approved by the <br /> QA/QC CONSULTANT and shall ensure uniform distribution of the <br /> material and prevent damage to the underlying geotextile and geomembrane <br /> lining. Approval does not absolve the EARTHWORK CONTRACTOR of <br /> responsibility for damage to underlying components. <br /> 4. Compaction of Coarse Gravel shall be accomplished by shovel-slicing <br /> during dumping. <br /> FORWARD LANDFILL 02300 <br /> 17 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.