My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Provide quality control certificates for each lot and each shifts production. The <br /> quality control certificates must include: <br /> 1. Roll numbers and identification. <br /> 2. Sampling procedures. <br /> 3. Results of quality control tests,including a description of test methods used. <br /> 2.4 LABELING <br /> A. Mark or tag geotextile rolls with the following information: <br /> 1. Manufacturer's name. <br /> 2. Product identification. <br /> 3. Lot number or date. <br /> 4. Roll number. <br /> 5. Roll dimensions. <br /> B. Mark special handling requirements on rolls. <br /> 2.5 DAMAGED GEOTEXTILE <br /> A. Geotextile damaged during transportation, loading,unloading,and delivery shall be <br /> documented by the QA/QC CONSULTANT. <br /> B. The GEOSYNTHETICS CONTRACTOR shall repair geotextile damaged before <br /> delivery to the satisfaction of the QA/QC CONSULTANT. If the geotextile can not <br /> be repaired to the satisfaction of the QA/QC CONSULTANT, the damaged <br /> geotextile shall be replaced by the GEOSYNTHETICS CONTRACTOR, at no cost <br /> to the OWNER. <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. Prior to installation of geotextile, examine underlying construction for conformance <br /> with Specifications. <br /> 3.2 PROTECTION <br /> A. When placing soil materials over geotextile ensure the following: <br /> 1. No damage to geotextile. <br /> 2. No slippage of geotextile on underlying layers. <br /> 3. No excessive tensile stresses in the geotextile. <br /> B. Ensure that geotextiles are covered within 10 days of deployment. <br /> FORWARD LANDFILL 02771 <br /> 4 GEOTEXTILES <br />
The URL can be used to link to this page
Your browser does not support the video tag.