My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Hot wedge welder: Automated variable speed vehicular mounted devices <br /> 40 equipped with devices adjusting and giving temperatures at wedge. Pressure <br /> controlled by spring, pneumatic, or other system that allows for variation in <br /> sheet thickness. Rigid frame fixed position equipment is not acceptable. <br /> 3. Maintain adequate quality of welding apparatus in order to avoid delaying the <br /> project. <br /> 4. Use power source capable of providing constant voltage under combined line <br /> load. <br /> E. General welding procedures: <br /> 1. Do not commence welding until trial weld test sample, made with the <br /> equipment to be used passes trial weld test. <br /> 2. Clean geomembrane surface of grease,moisture,dust,dirt,debris, and other <br /> foreign material. <br /> 3. Overlap panels a minimum 3 inches for extrusion and 4 inches for hot wedge <br /> welding. <br /> 4. Do not use solvents or adhesives unless product is approved in writing by the <br /> DESIGN ENGINEER. <br /> 5. Provide adequate material on weld to allow peel testing of both sides of <br /> double wedge weld. <br /> 6. Extend welding to the outside edge of all panels. <br /> 7. If required,provide a firm substrata by using a flat board,a conveyor belt,or <br /> similar hard surface directly under the weld overlap to achieve firm support. <br /> 8. Provide adequate illumination if welding operations are carried out at night, <br /> and night operations are approved by the OWNER. <br /> 9. Cut fishmouths or wrinkles along the ridge of the wrinkle in order to achieve <br /> a flap overlap. Extrusion weld the cut fishmouths or wrinkles where the <br /> overlap is more than 3 inches. When there is less than 3 inches overlap, <br /> patch with an oval or round patch extending a minimum of 6 inches beyond <br /> the cut in all directions. <br /> 10. Log every 2 hours: <br /> a. Temperature directly on the geomembrane surface being welded. <br /> b. Extrudate temperatures in barrel and at nozzle (extrusion welder). <br /> C. Operating temperature of hot wedge (hot wedge welder) and any <br /> pressure adjustments made. <br /> d. Preheat temperature. <br /> e. Speed of hot wedge welder in feet per minute. <br /> FORWARD LANDFILL 02778 <br /> HIGH DENSITY POLYETHYLENE <br /> 15 (HDPE)GEOMEMBRANE <br />
The URL can be used to link to this page
Your browser does not support the video tag.