My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Failed Weld Procedures. <br /> I. Follow these procedures when there is a destructive test failure. Procedures <br /> apply when test failure is determined by the QA/QC CONSULTANT, the <br /> GEOSYNTHETICS CONTRACTOR,or by field tensiometer. Follow one of <br /> the following two options: <br /> a. First Option. <br /> • Reconstruct the seam between any two passing test <br /> locations. The GEOSYNTHETIC'S CONTRACTOR can <br /> not perform the repair by extrusion welding the flap. <br /> b. Second Option. <br /> • Trace the weld at least 10 feet minimum in both directions <br /> from the location of the failed test, or to the end of the <br /> weld. <br /> • Obtain a small sample at both locations for an additional <br /> field test. <br /> • If these additional test samples pass field tests, then take <br /> laboratory samples. <br /> • If the laboratory samples pass, then reconstruct the weld <br /> or cap between the two test sample locations that bracket <br /> the failed test location. <br /> • If any sample fails,then repeat the process to establish the <br /> zone in which the weld must be reconstructed. <br /> F. Acceptable Welded Seams. <br /> 1. Bracketed by two locations from which samples have passed destructive tests. <br /> 2. For reconstructed seams exceeding 50 feet, a sample taken from within the <br /> reconstructed weld passes destructive testing. <br /> 3. Whenever a sample fails, provide additional testing for seams that were <br /> welded by the same welder and welding apparatus or welded during the same <br /> time shift. <br /> G. Seams That Cannot Be Non-Destructively Tested. Perform the following: <br /> 1. If the weld is accessible to testing equipment prior to final installation, <br /> non-destructively test the weld prior to final installation. <br /> 2. If the weld cannot be tested prior to final installation,cap strip the weld. The <br /> welding and cap-stripping operations must be observed by the QA/QC <br /> CONSULTANT and GEOSYNTHETICS CONTRACTOR for uniformity <br /> and completeness. <br /> FORWARD LANDFILL 02778 <br /> HIGH DENSITY POLYETHYLENE <br /> 22 (HDPE)GEOMEMBRANE <br />
The URL can be used to link to this page
Your browser does not support the video tag.