My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Verify that each roll is marked or tagged with the following information:manufacturer's <br /> name; project identification;, lot number; roll number; roll dimensions. Log this <br /> information on the geosynthetic receipt form. <br /> • Verify that the geosynthetic receipt form is completed. <br /> • Verify that materials are stored in a location that will protect the rolls from ultraviolet <br /> light exposure,precipitation,mud,dirt,dust,puncture,cutting,or any other damaging or <br /> deleterious conditions. <br /> Any damaged rolls may be rejected. Verify that rejected material is removed from the site or stored <br /> at a location separate from accepted rolls. Geotextile rolls that do not have proper manufacturer's <br /> documentation must also be stored at a separate location,until all documentation has been received <br /> and approved. <br /> 4.3.2 Geotextile Installation <br /> Surface Preparation. Before geotextile installation, the QA/QC Inspector will: <br /> • Verify that all lines and grades have been verified by the Contractor. <br /> • Verify that all seaming and required testing of the HDPE geomembrane underlying the <br /> cushion geotextile has been completed. <br /> • Verify that the granular drainage material underlying the filter geotextile has been placed <br /> to the required thickness. <br /> Geotextile Placement and Seaming. During geotextile placement and seaming operations, the <br /> QA/QC Inspector will: <br /> • Observe the geotextile as it is deployed and record all defects and defect corrective <br /> actions(panel rejected,patch installed,etc.). Verify that corrective actions are performed <br /> in accordance with the specifications. <br /> • Verify that equipment used does not damage the geotextile by handling, equipment <br /> transit, leakage of hydrocarbons, or other means. <br /> • Verify that crews working on the geotextile do not smoke,wear shoes that could damage <br /> the geotextile, or engage in activities that could damage the geotextile. <br /> Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.