Laserfiche WebLink
• A description of significant construction problems and the resolution of these problems. <br /> • A list of changes from the Construction Drawings and Specifications and the <br /> justifications for these changes. <br /> • As-built record drawings. <br /> • A statement that the interface shear strength meet or exceed the specified requirements. <br /> If the interface shear strength results do not meet or exceed the specified requirements, <br /> contact the Design Engineer and append a revised stability analysis, prepared by the <br /> Design Engineer. <br /> • A statement of compliance with the construction contract documents and design intent <br /> signed and stamped by the QA/QC Manager, a professional engineer registered in the <br /> state of California. <br /> The as-built record drawings will accurately locate the constructed location of all work items, <br /> including the location of piping, anchor trenches, etc. All surveying and base maps required for the <br /> development of the record drawings will be prepared by the Contractor.The QA/QC Manager must <br /> review and verify that as-built drawings are correct.As-built record drawings will be included in the <br /> final CQA report. <br /> Page 50 <br />