My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:15:06 PM
Creation date
7/3/2020 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2003-2005
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
703
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cahfora• • a Tgs ^� <br />onal Water Quali <br />t Control Board <br />Terry Tamminen Central Valley Region <br />Secretaryfor Arnold Schwarzenegger <br />Robert Schneider, Chair Governor <br />Environmental <br />Protection <br />11020 Sun Center Drive #200 Rancho Cordova, CA 95670-6114 <br />(916) 464-3291 - Fax (916) 464-4775 <br />http://www.swreb.ca.gov/rwgcb5 <br />August 4 2004 <br />Mr. Kevin Basso <br />General Manager <br />Forward Inc. <br />1145 West Charger Way <br />Stockton, CA 95206 <br />AUG 0 6 2004 <br />EW1R0tv1,V1E1,V, j <br />pERI�f ti'SHEti� 1�H <br />ERVICES <br />REVIEW OF FINAL CONSTRUCTION QUALITY ASSURANCE REPORT, WMU 1 <br />(CENTRAL PORTION, WESTERN AREA), FORWARD LANDFILL, SAN JOAQUIN <br />COUNTY <br />Central Valley Regional Water Quality Control Board staff (staff) has reviewed the Final Construction <br />Quality Assurance Report, WMUFU-04, (Central Portion, Western Area) at the Forward Landfill <br />submitted on 27 July 2004. The report documents construction and CQA procedures for the western <br />one third of new Class II Waste Management Unit ( FU -04. <br />The base liner for FU -04 -consists of from bottom to top: a prepared subgrade, a minimum 2 -foot <br />compacted clay liner, 60 -mil HDPE geomembrane, a minimum 1 -foot of granular drainage layer, 8- <br />oz/yd2 filter fabric, and minimum 1 -foot operations layer; and the side slope liner consists of: a <br />prepared subgrade, a Geosynethetic clay liner (GCL), a geocomposite drainage material and a <br />minimum 1 -foot operations layer (constructed in 10 -foot lifts as the unit fills). Where the unit is <br />constructed over the capped Austin Road Landfill the liner consists of 5 -feet of engineered fill, GCL, <br />60 -mil HDPE, a geocomposite drainage layer and a minimum 1 -foot thick operations layer (to be <br />placed as needed during operations). The report addresses: preparation of the subgrade; construction <br />of a compacted clay liner; installation of Geosynethetic clay liner on side slopes; placing HDPE <br />geomembrane to forma composite base liner; constructing a LCRS of geocomposite drainage net on <br />the side slopes and gravel drainage blanket on the base; constructing LCRS sumps; and placing the soil <br />operations layer. <br />Vector Engineering conducted the CQA observations and testing during construction of the waste <br />management unit. Vector states that the composite liner system has been constructed in accordance <br />with the plans and specifications with approved clarifications and modifications, Title 27 and <br />Construction Quality Assurance Manual WMU FU -04. Based on the CQA report, on supporting test <br />results and design documents the western one third of the central portion of WMU FU -04 is approved <br />for waste discharge operations in accordance with the facility's waste discharge requirements. <br />Staff understands that completion of the eastern two thirds of the central portion of WMU FU -04 has <br />been held up due to limited availability of gravel drainage material. The remaining area of WMU FU - <br />04 is projected to be complete in mid-August with a revised CQA report to be submitted shortly after <br />California Environmental Protection Agency <br />ca Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.