My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:15:06 PM
Creation date
7/3/2020 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2003-2005
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
703
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately 6 feet of radius of influence overlap. Additional wells will be installed as <br />necessary in the next phase, with spacing based on the monitoring results of the 39 probes <br />and 13 wells installed. <br />4.2 PROBE INSTALLATION <br />Multi -depth gas monitoring probes will be installed along the western boundary of the <br />landfill as shown in Figure 2. Construction of the probe will be as shown on Figure 3. A <br />cluster of three probes will be installed in each borehole with depths of 10 feet, 20 feet, <br />and 35 feet. A concrete vault will be installed flush with grade with each probe identified <br />with an I.D. tag. <br />4.3 GAS EXTRACTION WELL INSTALLATION <br />F� <br />11 <br />I' <br />I <br />Thirteen gas extraction wells will be installed during the initial phase as shown on Figure 2. <br />Construction of the LFG extraction wells will be as shown on Figure 4. The wells will 30 <br />feet deep, consisting of 2 -inch schedule 80 PVC pipe. The lower 10 feet will be perforated <br />and the upper 20 feet will be solid pipe. Each well will be connected to the existing gas <br />header system and have a monitoring port and valve to adjust the vacuum to the well. <br />T Leiki11 ti] R 10M.30I O7 iVIMU111A, 1_13010 <br />Forward will monitor these wells and probes to determine the effectiveness of the initial <br />system installed. The data will be evaluated and a determination will be made regarding <br />the need for, and location of, additional LFG extraction wells for the next phase. <br />10 <br />Installation Work Plan to Remediate landfill Gas Migration <br />J:\Allied\Forward\Workplan\Forward Evaluation - rev4.doc:9/15/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.