VA7d L, <br /> EIVGINEERflVQ INC. <br /> DAILY CONSTRUCTION FIELD REPOR T* <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 64 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan (Forward, Inc.) November 19, Wednesday <br /> 2003 <br /> General Contractor: Liner Contractor. Project Engineer <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Are Khounnlolian <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cool,hazy and Iden Davila <br /> bree <br /> Equipment on site: <br /> 1-16G blade 1-water truck, 1-smoothdrum roller, 1-backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss the deployment schedule and cell floor <br /> conditions. They began the morning deploying geocomposite on the north 2:1 and 5:1 cell slopes. Concerns <br /> were discussed about the high moisture values of the cell floor clay. Prior to deployment,and at the request <br /> of Butch S.,five(5)baggie samples were obtained at various locations that appeared to be of the highest <br /> moisture contents. All samples were within the three(3)to eight(8)percent above optimum moisture <br /> content as stated in the specifications. The GSE foreman was verbally informed of the results and I <br /> informed him that it would be up to him to decide if he wanted to deploy since a subgrade acceptance form <br /> would have to be signed. He stated that he would begin deployment in the afternoon after the clay.had a <br /> chance to dry a little further. 60 mil liner was deployed on the east floor of the FU-03 cell. Nine(9)rolls of <br /> double textured 60 mil were placed and seamed throughout the afternoon. Destructive sample locations <br /> were marked for tomorrow's cutting and testing. Two(2)panels of twelve-ounce(12oz)geotextile were <br /> placed along the eastern edge of the cell boundary in the early evening. <br /> Sukut continued work on the access road, importing baserock and blading and compacting the road <br /> material. Laborers continued to remove visquine from the west cell floor. Minor work was performed on the <br /> clay in the southeast and southwest floor corners. Tim S. stated that a sample of the(-3/8")granular <br /> drainage material would be delivered to the site by Granite personnel tomorrow. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r_, <br />