Laserfiche WebLink
VCrITOR <br /> NGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 73 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan(Forward, Inc.) November 28, Friday <br /> 2003 <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cold,clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site to perform calculations and to test the destructive samples obtained to date(up to DS-32). <br /> Destructive sample number DS-33 had not been received,but was cut out and the GSE portion tested on <br /> site by GSE had failed in peel.As per specification,the seam will be sampled at a distance of ten(10)feet <br /> on either side of the failing location until a passing test is obtained. <br /> Ask <br /> prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r9 <br />