My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V TV <br /> rjuCTOR <br /> INGINEERIlVQ INC. <br /> DA/LY <br /> CONSTRUCTION FIELD REPORT <br /> I* <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 80 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. December 9,2003 Tuesday <br /> General Contractor: Liner Contractor: project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: (hers: <br /> Tim Sues Ayre Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cool, clear and Ken Davila <br /> bree <br /> Equipment on site: <br /> 1-D6 LGP dozer, I-D4 dozer, I-ski loader,20—Bell dum trucks, 1-backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Sukut foreman to discuss today's granular drainage rock placement <br /> schedule. The(20)belly dump trucks continued delivering minus three-eighths inch(-3/8")drain rock <br /> throughout the day. The material was placed by conveyor onto the east FU-03 cell floor and spread <br /> westward and northward by D6 and D4. Grade indicating devices continued to be placed on thirty-five foot <br /> centers on the cell floor to ensure that the material was placed at proper one foot(1')thickness. The <br /> material was also randomly probed by hand to double check the thickness. The pipe,gravel and geotextile <br /> were placed in the leachate pond sump. <br /> GSE was not on site today. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r_, <br />
The URL can be used to link to this page
Your browser does not support the video tag.