My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> r1EW?VG1AE'VETRflQ INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 83 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. December 16,2003 1 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouang King Bailey Sukut <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stoc iled, light brown silty Clay Cool, cloudKen Davila <br /> and brae <br /> Equipment on site: <br /> 1-D6 LGP dozer 1-backhoe 1-627 sora er 1-D4 dozer <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Sukut foreman to discuss today's plan of operation. They began using <br /> the D4 and D6 to spread out the granular drainage material from the north to the south in the early morning. <br /> After the granular drainage material's depth was physically verified,the eight-ounce(8oz) geotextile was <br /> rolled out over the drain rock. In the early afternoon,the scraper began hauling operations layer that was <br /> placed in the northeast quadrant of the FU-03 cell over the geotextile. The foreman stated that granular <br /> drainage material would begin to be imported tomorrow morning. <br /> The foreman for GSE was on site to demob equipment and deliver pertinent documentation. One damaged <br /> area on the east leachate pond upper slope at the anchor trench was noted. It was also brought to the <br /> attention of the Sukut foreman. Another damaged area on the bench between the 5:1 and 2:1 slopes of the <br /> north cell was brought to the attention of Forward,Inc. personnel because it had been caused by trespassers <br /> on a motorcycle. <br /> epared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />
The URL can be used to link to this page
Your browser does not support the video tag.