Laserfiche WebLink
SIGNATURE PAGE <br /> Vector Engineering, Inc. (Vector) provided construction quality assurance services <br /> during the construction of WMU FU-03, WMU F-West Leachate Impoundment and the <br /> desilting basin at the Forward Landfill. The following final construction certification <br /> report was prepared by Vector and is hereby submitted to the Regional Water Quality <br /> Control Board (RWQCB). <br /> This report was prepared in accordance with generally accepted geotechnical and <br /> geosynthetic engineering practices applicable at the time the report was prepared. <br /> Vector makes no other warranties, either expressed or implied, as to the professional <br /> advice provided under the terms of this agreement, and as described in this report. Our <br /> recommendations consist of professional opinions and conclusions based on our <br /> testing and inspection program performed during construction. <br /> The purpose of this report is to inform the RWQCB that, in our professional opinion, the <br /> WMU FU-03 liner system at the Forward Landfill has been constructed and completed <br /> in general accordance with the project plans and specifications. During the <br /> construction, Vector conducted observations and testing to determine that the <br /> construction was conducted in general accordance with the project plans and <br /> specifications. The conclusions of our observations and testing, together with a written <br /> narrative describing the personnel, scope, methods, procedures and results of our CQA <br /> services, have been included in this certification report. <br /> VECTOR ENGINEERING INC. <br /> QROFESS/4 <br /> to <br /> z <br /> C58866 rt <br /> � e„ <br /> Monte A. Christie, P.E. * ® aD <br /> No C58866 `P CIVIL <br /> CQA Engineer ®F Cq`IEA� <br />