Y7ECTOR <br /> ENGINEERING, INC. <br /> 0 <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 24 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. Oct 1,2003 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal Lochlin Caffey Allied <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm, clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-D6 dozer, 1-water truck, i-D8 dozer,2-633 scra ers, I- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Arrived on site for testing and observations at the location listed above. Sukut Construction began placing fill <br /> along the access road to the FU-03 refuse cell from the scale house west. The blade cut and shaped the north <br /> slope of the refuse cell over the existing refuse. The D6 cut the west slope of the cell with the scraper hauling <br /> the cut material to the haul road fill area and to the stockpile. The D8 dozer applied compactive effort along <br /> Aftvith the scrapers in the fill area. <br /> hree(3)nuclear moisture density tests were performed at random locations and elevations on the native fill. <br /> All tests passed specification in density and in moisture content. The on site foreman was verbally informed <br /> of the test results. Other on site laboratory testing included calculating the Atterberg limits test values on <br /> sample CL-5, which was performed yesterday. The sample passed the required values per specification. <br /> Lochlin Caffey(Allied)arrived on site in the mid morning for an on site meeting also attended by Jim H. <br /> (Sukut),Butch S. (Forward)and me. Project progress and scheduling were among the items discussed. <br /> Another meeting was scheduled for the 8d'of October. <br /> Ask <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> C-7 <br />