My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V 777 <br /> v i,, CTOR <br /> ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT* <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 27 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. October 6,2003 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasai <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm, clear and Ken Davila <br /> bree <br /> Equipment on site: <br /> 2-D6 dozers 1-water truck, 1-D8 dozer, 1-633 sora er, 1- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for testing and observations at the location listed above. Sukut Construction continued <br /> placing fill on the access road from the scale house west toward the FU-03 refuse cell, using the scraper to <br /> haul native stockpiled material. The 16G blade cut and shaped the north slope of the refuse cell over the <br /> existing refuse from north to south. One D6 cut the west and north slopes of the desalting pond as the other <br /> continued on the west and south slopes of the FU-03 cell. <br /> Two(2)nuclear moisture density tests were performed at random locations and elevations on the native <br /> fill along the access road. Both tests passed specification in density and in moisture content and the on site <br /> foreman was verbally informed of the test results. <br /> One(1)bulk composite bucket sample of the stockpiled material was obtained of the native clay for on site <br /> laboratory testing. <br /> Ah <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> ('.-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.