My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17ECTOR <br /> ENGINEERING INC. <br /> 0 ®ALLY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 34 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. October 15,2003 1 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal Air King Bailey Sukut <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm, clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> 1-D6 dozer, 1-water truc 1-D5 dozer,2-633 sora ers, 1- 16G blade, 1-825 com actor <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Sukut foreman to discuss the testing and sampling locations at the <br /> location listed above. The 16G blade cut the north and west FU-03 cell floor areas through the day's shift. <br /> The D6 dozer and the D5 dozer cut the west and south slopes FU-03 cell as one scraper hauled the excess <br /> cut material to the fill area on the floor. The other scraper continued hauling clay out of the stockpile to the <br /> east and placing it on the north central floor. The 825 sheepsfoot supplied compactive effort to the native <br /> clay throughout the day. <br /> In the early morning, two(2)trucks arrived on site with a total of thirty-two rolls of geosynthetic clay <br /> liner(GCL). The material was logged in, checked for damage, and unloaded. GSE personnel unloaded the <br /> trucks and filled sand bags for the rest of the day. <br /> Three(3)drive tube permeability samples were obtained and were taken to off site Vector personnel for <br /> delivery to the laboratory this evening. Five(5)nuclear moisture density tests were performed at random <br /> locations and elevations on the native clay in the FU-03 cell. All tests passed the 90 percent compaction <br /> specification and also passed the moisture content specification. The on site foreman was verbally informed <br /> of the test results. <br /> In the early afternoon,an on site weekly meeting was held to discuss project progress and scheduling. The <br /> current schedule projects a completion date of approximately January 7 ,2004. <br /> On site lab testing of the clay material continued with two(2) sieve analysis samples washed and placed <br /> into the oven for tomorrow's testing. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-? <br />
The URL can be used to link to this page
Your browser does not support the video tag.