My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17ECTOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPOR <br /> $1 <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 49 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. November 1,2003 Saturday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasa] I Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cold,clear and Ken Davila <br /> CLAY brae to wind <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> After receiving an early morning phone call from the GSE superintendent,I arrived on site and met with <br /> him to discuss the deployment schedule for the day. They began placing geosynthetic clay liner(GCL)on <br /> the west slope of the FU-03 cell working from north to south. Fifteen panels of 60 mil single textured <br /> HDPE were also placed, seamed and air tested on the same slope. Geocomposite was placed over that. <br /> Sandbags were also placed along the west toe of slope of the cell. <br /> Sukut was not on site and therefore no earthworks operations were performed. <br /> Prepared By: f Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r_, <br />
The URL can be used to link to this page
Your browser does not support the video tag.