Laserfiche WebLink
FINAL DRAFT <br /> JOINT TECHNICAL DOCUMENT <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 5.3.4.6 Implications to Liner and Cover Design 5-20 <br /> 5.3.5 Leachate Generation 5-20 <br /> 5.3.6 Surface Water Control 5-24 <br /> 5.3.7 Landfill Gas Generation and Air Emissions Calculations 5-25 <br /> 5.4 Construction Quality Assurance 5-26 <br /> 5.4.1 Introduction and Purpose 5-26 <br /> 5.4.2 Responsibility and Authority 5-27 <br /> 5.4.3 Personnel Qualifications 5-27 <br /> 5.4.3.1 CQA Manager 5-28 <br /> 5.4.3.2 CQA Inspection Personnel 5-28 <br /> 5.4.4 Inspection Activities 5-28 <br /> 5.4.4.1 Pre-Construction 5-28 <br /> 5.4.4.2 Construction 5-28 <br /> 5.4.4.3 Post-Construction Final Documentation 5-31 <br /> 6.0 DISPOSAL SITE OPERATIONS 6-1 <br /> 6.1 Hours 6-1 <br /> 6.2 Personnel 6-1 <br /> 6.2.1 Training 6-2 <br /> 6.2.2 Management Structure 6-3 <br /> 6.2.3 Emergency Contact List 6-4 <br /> 6.3 Equipment 6-5 <br /> 6.3.1 Minimum Equipment Requirements 6-5 <br /> 6.3.2 Standby Equipment 6-5 <br /> 6.3.3 Equipment Preventative Maintenance 6-6 <br /> 6.4 Material Handling Activities 6-6 <br /> 6.4.1 Construction Phasing 6-6 <br /> 6.4.2 Unloading 6-6 <br /> 6.4.3 Spreading and Compaction 6-6 <br /> ® 6.4.4 Daily Cover 6-7 <br /> Forward Landfill)TD Iv <br /> ):\Allied\Forward\)TD Amendment\Final JTD Amendment\TOC.doc:TOC.doc5/24/02 <br /> Rev.1:7/2002;Rev.2:4/2003;Rev.3:6/2003 <br /> Amendment No.1: 8/1/2005 BRYAN A.STIRRAT a ASSOCIATES <br />