Laserfiche WebLink
Photo Log <br /> AWI Forward Landfill <br /> Perimeter Gas Migration Control System <br /> Project No. 110799 <br /> Photo Description <br /> Frwd-001 Top view of multi-level gas monitoring robe. <br /> Frwd-002 Sacks of bentonite seal. <br /> Frwd-003 Sacks of sand. <br /> Frwd-004 Top view of vertical gas extraction well with temporary vc cap. <br /> Frwd-005 TRG crew drilling with an air rotary. <br /> Frwd-006 Top view of finished drilled hole. <br /> Frwd-007 Soil sam les of drilling every five feet. <br /> Frwd-008 Soil samples of drilling eve five feet. <br /> Frwd-009 Soil samples of drilling eve five feet. <br /> Frwd-010 Soil samples of drilling every five feet. <br /> Frwd-011 Soil samples of drilling every five feet. <br /> Frwd-012 Preparation of gas monitoring robe casings installation. <br /> Frwd-013 Soil sam les of drilling every five feet. <br /> Frwd-014 Soil samples of drilling every five feet. <br /> Frwd-015 Soil samples of drilling every five feet. <br /> Frwd-016 Soil samples of drilling eve five feet. <br /> Frwd-017 Soil samples of drilling eve five feet. <br /> Frwd-018 Soil samples of drilling every five feet. <br /> Frwd-019 Excavation for below grade road crossing. <br /> Frwd-020 Excavation for below grade road crossing. <br /> Frwd-021 Applying adhesive to road crossing well connection. <br /> Frwd-022 2" evc well lateral and 6"csp sleeve. <br /> Frwd-023 Connecting 6"csp sleeves together. <br /> Frwd-024 2" pvc well lateral connected to vertical well. <br /> Frwd-025 Installing 2"pvc to existing below grade 18"hd a header. <br /> Frwd-026 Backfilling below grade road crossing. <br /> Frwd-027 Installing 2" pvc male adapter to existing below grade 18" hd a header. <br /> Frwd-028 Wellhead connected to 18" hd a header. <br /> Frwd-029 Installing channel pi e support. <br /> Frwd-030 Wellhead with channel pipe support connected to 18" hd a header. <br /> Frwd-031 Fencing that was removed to install probes and wells. <br /> Frwd-032 Fencing that was removed to install probes and wells. <br /> Frwd-033 Probe and well locations along fence line. <br /> Frwd-034 Probe and well locations along fence line. <br /> Frwd-035 Top view of probe. <br /> Frwd-036 Top view of probe. <br /> Frwd-037 Top view of probe. <br /> Frwd-038 Sacks of sand. <br /> Frwd-039 Sacks of sand and bentonite seal. <br /> Frwd-040 Probe construction. <br /> Frwd-041 Probe construction. <br /> Frwd-042 Probe construction. <br /> Frwd-043 Probe construction. <br /> Frwd-044 Probe construction. <br /> Frwd-045 Probe construction. <br /> 1 of 2 <br />