Laserfiche WebLink
4 CONCLUSIONS <br /> EMCON CQA monitors observed the drilling and construction activities for the perimeter <br /> LFG migration control system expansion at the FSL. Based on observations of site <br /> conditions and construction activities, and review of submittals from the contractors, <br /> suppliers, and manufacturers of materials, EMCON believes that the system expansion <br /> was constructed in general conformance with the intent of the construction drawings and <br /> specifications, using industry-standard construction practices. <br /> EMCON/OWT <br /> N:\_LANDFIL\AWI Austin Road-Forward\2004 SVE CQA\text\report\CQA report final.doc Rev.0,1/5/05 <br /> 4-1 <br />