Laserfiche WebLink
is utilized. These records are available for your review and should satisfy any concerns <br /> that non disposal soils are somehow being misused at the Forward facility. <br /> Given the foregoing, we respectfully request that you revise your report to eliminate <br /> references to violations related to our permitted daily and weekly tonnage caps. We <br /> understand that there is an outstanding issue concerning whether material used as <br /> Alternative Daily Cover (ADC) or beneficial reuse counts towards the daily cap and we <br /> are willing to work through you and CIWMB staff to resolve that issue. As noted <br /> previously, we are still below the daily and weekly tonnage thresholds even if we include <br /> ADC and beneficial reuse materials in our daily and weekly waste receipts (as confirmed <br /> by review of the attached daily reports for June 2005). <br /> Amended RDSI <br /> As we have indicated to you over the past couple of months, we are in the final stages of <br /> preparing an amended Report of Disposal Site Information that is required by the new <br /> ADC regulations. The document will also clarify and update information in the current <br /> document that has led to some confusion (i.e., cover ratios, site operational info, etc.). At <br /> the joint meeting with CIWMB staff, we committed to provide you with the RDSI <br /> amendments by July 31, 2005. We are on track for submittal of this document to you <br /> and appreciate your patience in working through the matter. You will most likely receive <br /> the document prior to drafting your report for our July site inspection and we would <br /> appreciate not having this issue listed as a violation on future inspection reports <br /> ® (including the one for July 2005). <br /> By submittal of the report we believe we have complied with the regulatory criteria as <br /> well as your request to clarify various aspects of the document. While there may be areas <br /> of the amended RDSI which you require clarification on, we would hope that those can <br /> be handled through mutual cooperation and not through the use of continued violations. <br /> Gas Control on Forward Landfill Site <br /> Our project teams are currently installing 23 additional gas extraction wells in the area <br /> where gas has accumulated on the west end of the Forward Landfill site. We are hopeful <br /> that this latest phase of capital investment and engineering work will alleviate the issues <br /> related to exceedance of thresholds for methane gas. This work is scheduled to be <br /> completed by July 29, 2005 and its effectiveness can be gauged at that point. Forward, <br /> Inc. is committed to addressing this issue and we believe that our investment in <br /> infrastructure to control the methane gas has demonstrated this commitment. <br /> Green Waste Containing Food Waste <br /> The subject of yard waste containing food waste and the ability to use the material for <br /> ADC has been the subject of much debate with the LEA and the CIWMB staff over the <br /> course of the past several months. <br /> 2 <br />