Laserfiche WebLink
ensure that trash hazardous wastes and other contaminants are not mixed in with <br /> 41 the green waste material. The PGM is stockpiled on the ground for a maximum <br /> of 21 days. On-site staff monitors any PGM stockpiled for excessive heat, <br /> potential combustion, and other nuisances such as vectors, odors, dust, and litter. <br /> The site supervisor is notified if any of these issues need immediate attention or <br /> additional staffing_ A mobile grinder is brought to the site to chip and grind the <br /> stockpile within 21 days. The PGM is transported by on-site personnel and <br /> equipment and deposited near the active face. <br /> Four staff are currently required to apply PGM; one for the loader, two for the <br /> haul trucks, and one for the dozer. Spreading and compacting of the day's <br /> wastes prior to application of daily cover will be consistent with the procedures <br /> established in the facility's ITD. The PGM is loaded onto haul trucks, which then <br /> dump the material on or directly adjacent to the working face requiring daily <br /> cover. Thereg en material is placed over the waste and compacted to provide a <br /> cover with a minimum compacted thickness of six inches and an average <br /> compacted thickness no greater than 12 inches. Dozer(s) are used to evenly <br /> spread the PGM. The operator will take adequate steps to ensure that processed <br /> green material cover will not be exposed to the elements for more than 21 days. <br /> Odor and moisture infiltration are also addressed by utilizing 100 percent soil <br /> cover on days proceeding non-operational days. Four staff are eurFe.-tl y required <br /> t&-appl-y-PGM-ane4of ,-t-he-leadef, e ,gf4he4tau44f dks,- and-ene4or-�e-dezer. <br /> requiringThe leader leads the PGM ente the haul trueks, whieh then dump the material en <br /> the area _ -_--TTp I.V YI.I, and then the dezer is used to evervlyJ ,l.Ll <br /> material. The material is spread te eernpaeted thickness of 6 inches <br /> and an avemge-ee pa.-+,,e,4 1U_U 4. 1 i,ness-4less-tl}aR-er equal-te-12 inehes—D G"n <br /> that is placed as cover is-Fetexposed-fer greater than 21 days.—If more material <br /> comes in than is required for the day, the material is stockpiled onsite and <br /> Iprocessed and used, as needed. PGM is generally processed within 72 hours. <br /> Geosynthetic Blanket and Panel Products (Tarps):_ During daily landfill <br /> operations, the size of the working face will be maintained at a size five (5) to <br /> ten (10) feet smaller for each dimension as compared to the size of the ADC <br /> panel total area. When more than one panel is utilized, they will be overlapped <br /> a minimum of three feet and secured. After properly compacting the waste, the <br /> tarp is placed over the exposed refuse. The panel(s) is (are) placed on the <br /> exposed refuse face in the evening. Three staff are required to place the tarp(s). <br /> Forward Landfill JTD 6-9 <br /> J:\Allied\Forward\JTD Amendment\Final JTD Amendment\JTD Rev Sec 6 080105.doc:5/22/02 <br /> Rev.-1 7/2002:Rev.2:4/2003;Rev 3:6/2003 <br /> Amendment No.1:8/1/2005 <br />