Laserfiche WebLink
UV/UI/LUUS 1B:uz FAX <br /> SI Pte-07-2005 12: 17 RM 001 <br /> P- 02 <br /> oz N'o.•25 :urs 34, <br /> PublJoidon No. 23 <br /> WHAT -ToNNAGEAmoUNTs LED <br /> SfTE COUNT FOR PURPOSES OFTHEAGE <br /> LIMITS IN TBE PERMIT? <br /> To All Local Eaforcement Agmcgcs <br /> The <br /> ""d of nils advisory is to clarify the confinlon of what MaterialA tbcolved and/or handled ar a <br /> facllieY count toward the tODnW limits placed in the Solid Wasto Naciuldei pc=k Cmn.Wtj. The <br /> typiml can®PresentIng this problem is the IAOM which rweivea Ing amnuuts of waste to be <br /> handled by added ting. or soil remediation operatlons. if ttK potmit bm not boss <br /> rtwised to include new activities and increased tannA968, mots waste is rived "through the game <br /> than the original P&MIL provided. A typico variant of thla hypothadcal It the landfill which has <br /> revlaed la permit of ObUIDW additional permits to reSulato the NW, COMP099LD8. toll Iation, <br /> or ocher aetJvity COMALM4 withtn the permitted boundaries of the ot'jbW UnMI. Tn-efthar case. <br /> more waste than the iandau is P=1JtU4 to handle for disposal is weighed or counted at rise gag. <br /> The tomMe aouatad for pulposgg of limits in the permit sboWd be the tonnage handled at the facaity <br /> under ftpcmft in question. The tonnage counted d= ZO include tio <br /> At tranafer stations of a <br /> material rve facilities.- al material b"htinto the hCtial Used lty should be <br /> Counted as tannage, <br /> activities uLkc place at a facillry, whore each activity Is permitted under a separate <br /> pmt, such as landfilling, tmwfat and iW operation, tonnage gbould be zu4pW, attributed, <br /> credited or imputrd to each operators permit. <br /> Where a facility bas a single Wmit which is used to regulato savcral or activities, the cxb ng <br /> permit stated totmage applies to AU activities listed in the permit. <br /> Tho Board has developed Regulatory Tier Regulations for solid waste facilities. Compost fitcilities <br /> will bo the fust type of facilities placed into the tines. Facil tk* that arc placed in the regulatory tiers <br /> MY hava limits placed ou the aanount of material that tray be on site at MW given time, and may bot <br /> place 11mits on the AMOM of material roeelved. <br />