Laserfiche WebLink
3.0 CLOSURE LAN <br /> 3.1 INTRODUCTION <br /> The Stage IA partial closure of the Forward Landfill will be performed in <br /> accordance with the applicable regulatory standards included in 27 CCR, <br /> Chapters 3 and 4 and 40 CFR, Subpart F. The costs associated with the closure <br /> of Stage IA are described in Section 6.0 of this document. The improvements <br /> and systems required for the closure of Stage IA include the final cover and final <br /> grading plan, supported by landfill settlement and slope stability analyses, <br /> drainage and erosion control systems, landfill gas control and monitoring <br /> systems, groundwater/surface water monitoring system, and decommissioning of <br /> environmental control systems. A description of these closure improvements as <br /> well as a schedule for construction is presented in the following subsections. <br /> 3.2 FINAL COVER <br /> The purpose of a final cover is to provide long-term minimization of surface <br /> water intrusion, to isolate wastes from the ground surface, and to reduce the <br /> potential for odors and gas emissions. The cover also provides a base for <br /> vegetation, which will reduce drainage velocities and erosion. In addition, the <br /> final cover configuration is designed to accommodate settlement, subsidence <br /> and the effects of seismic events throughout the minimum 30-year post-closure <br /> maintenance period and beyond. <br /> 3.2.1 FINAL COVER DESIGN <br /> 3.2.1.1 REGULATORY DESIGN STANDARDS <br /> California Final Cover Prescriptive Design Standard <br /> The minimum final cover standards for the Forward Landfill, as outlined in the <br /> closure and post-closure requirements for Class II landfills contained in 27 CCR, <br /> Section 21090 include: <br /> • Foundation Layer: A minimum two-foot thick layer of soil placed <br /> immediately over the entire surface of the last lift of refuse. This layer shall <br /> have the appropriate engineering properties, so as to provide a relatively <br /> Forward Landfill PFCPCMP 3-1 <br /> J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec3.doc:6/15/2005 <br />